Burndown Chart Calculator — Sprint Velocity & Scope

Track your agile sprint in real time: enter the total story points, sprint length, days elapsed, and points completed to see your ideal vs. actual burn rate, remaining scope, and whether you will finish the sprint on time.
Total backlog committed at the start of the sprint

days

days

How many working days have passed so far
Points actually burned down to date
Scope added after sprint start (0 if none)
Remaining story points
55

Behind schedule — projected to finish 5.8 days late

Ideal burn rate
5.71 pts/day
Actual burn rate
4.29 pts/day
Velocity gap
-1.43 pts/day
Projected completion
Day 19.8
Sprint status
5.8 days over
Step by step
  1. 1

    Total scope (original + added)

    80 + 5 = 85
  2. 2

    Points completed to date

    30
  3. 3

    Remaining story points

    85 − 30 = 55
Lock the current result, then change any input to compare scenarios.
Results are estimates for general information only and are not professional advice — always verify important results independently before relying on them. This is not financial, investment or tax advice; consult a qualified professional. Read the full disclaimer.
Quick answer

How does this calculator work?

Ideal burn rate = total story points ÷ sprint days. Actual burn rate = points done ÷ days elapsed. Remaining work = total + added scope − completed. Projected completion = remaining ÷ actual burn rate. If that date falls after the sprint end, the team is behind by the difference.

Formula
Ideal burn/day = Total ÷ Sprint days • Actual burn/day = Done ÷ Days elapsed • Runway = Remaining ÷ Actual burn/day
How this is calculated

A burndown chart plots remaining work (story points, tasks, or hours) against time. The ideal burndown is a straight line from total story points on day 0 to zero on the last day of the sprint, representing a perfectly constant velocity. The actual burndown shows how work is really being completed.

This calculator takes the sprint's starting backlog, any mid-sprint scope additions, and the actual points completed so far to compute the current remaining work and the actual burn rate (points per day). It then projects how many total days the sprint will take at that rate. If the projected total exceeds the sprint length, the sprint is behind schedule by that many days.

Scope creep (story points added mid-sprint) is tracked separately so you can see its direct impact on the remaining work. The calculator does not model day-to-day fluctuations or non-working days — for those, use your team's agile tool (Jira, Linear, Azure DevOps) which can pull actual hourly data.

Frequently asked questions

A burndown chart is a project management tool — common in Scrum agile development — that shows the amount of work remaining in a sprint on the y-axis and the days of the sprint on the x-axis. The ideal line goes from the total work at day 0 to zero at the last day. The actual line shows real progress, revealing whether the team is ahead or behind.

Story points are a unit of estimation used by agile teams to measure the effort or complexity of a task. When a task is completed (accepted), its story points are "burned" — removed from the remaining backlog. Burning more points per day than the ideal rate means the team is ahead of schedule.

Mid-sprint additions raise the remaining work above the ideal line, making the sprint harder to complete on time. The calculator tracks added scope separately so you can see its impact. Best practice in Scrum is to not add scope mid-sprint; if it is unavoidable, remove an equivalent number of lower-priority stories.

Also known as

sprint burndown calculator
story points remaining calculator
agile velocity calculator
scrum sprint burndown tracker
ideal vs actual sprint velocity
project completion estimate agile

APA

TG we-Calculate Editorial Team. (2026). Burndown Chart Calculator — Sprint Velocity & Scope [Online calculator]. TG we-Calculate. https://we-calculate.com/calculator/burndown-chart-calculator

Chicago

TG we-Calculate Editorial Team. "Burndown Chart Calculator — Sprint Velocity & Scope." TG we-Calculate. 2026. https://we-calculate.com/calculator/burndown-chart-calculator.

IEEE

TG we-Calculate Editorial Team, "Burndown Chart Calculator — Sprint Velocity & Scope," TG we-Calculate, 2026. [Online]. Available: https://we-calculate.com/calculator/burndown-chart-calculator

BibTeX

@misc{wecalculate_burndown_chart_calculator, title = {Burndown Chart Calculator — Sprint Velocity & Scope}, author = {{TG we-Calculate Editorial Team}}, howpublished = {\url{https://we-calculate.com/calculator/burndown-chart-calculator}}, year = {2026}, note = {TG we-Calculate} }

Did this calculator help you?