Beginner

ADR Calculator — Average Daily Rate for Hotels

The Average Daily Rate (ADR) is the most widely used hotel performance metric. Enter total room revenue, rooms sold, and total rooms available to compute ADR, occupancy rate, and Revenue Per Available Room (RevPAR).
Total revenue from all room sales in the period
Number of rooms (room-nights) actually sold
Total rooms available for sale in the same period
Average Daily Rate (ADR)
300

Revenue per occupied room in the period

Occupancy rate
62.5 %
RevPAR
187.5
Rooms sold
50
Vacant rooms
30
Potential lost revenue
9,000

62.5%

Occupancy

Rooms sold

62.5%

Vacant rooms

37.5%

Step by step
  1. 1

    Occupancy rate

    50 ÷ 80 × 100 = 62.5 %
    Share of available rooms that were occupied in the period.
  2. 2

    Average Daily Rate

    15,000 ÷ 50 = 300
Lock the current result, then change any input to compare scenarios.
结果仅为一般参考性的估算,并非专业建议——在依赖这些重要结果之前,请务必自行独立核实。 这不构成财务、投资或税务方面的建议;请咨询合格的专业人士。 阅读完整免责声明.
快速解答

这个计算器是如何工作的?

ADR = total room revenue ÷ rooms sold. Occupancy rate = rooms sold ÷ rooms available × 100%. RevPAR = ADR × occupancy rate. For a hotel that sold 50 rooms for $15,000 out of 80 available, ADR = $300, occupancy = 62.5%, RevPAR = $187.50. RevPAR is the key benchmark because it accounts for unsold rooms.

公式
ADR = Total Room Revenue ÷ Rooms Sold | Occupancy % = Rooms Sold ÷ Rooms Available × 100 | RevPAR = ADR × Occupancy %
How this is calculated

ADR (Average Daily Rate) measures the average revenue earned per occupied room in a given period. It is calculated by dividing total room revenue — excluding food, beverage, and other ancillary charges — by the number of rooms sold (room-nights) in that period. If a hotel sold 50 rooms at a mix of prices generating $15,000 in revenue, the ADR is $300.

Occupancy rate answers "how full was the hotel?" and is found by dividing rooms sold by total rooms available, expressed as a percentage. RevPAR (Revenue Per Available Room) blends the two: it equals ADR multiplied by the occupancy rate (as a decimal), or equivalently total room revenue divided by total rooms available. RevPAR is the industry benchmark because it penalises unsold inventory — a hotel at full occupancy at a discount and a half-empty hotel at a premium both reveal their true performance through RevPAR.

This calculator uses a single period (which could be one day, one month, or one year — consistency matters). The "potential lost revenue" figure estimates what vacant rooms would have earned at the ADR, giving a sense of yield gap. Actual pricing strategy (dynamic pricing, packages, length-of-stay restrictions) determines how close a property gets to that ceiling.

常见问题

A "good" ADR depends entirely on the market, star rating, and location. Budget motels may have an ADR below $80, while luxury city-centre hotels routinely exceed $300. The key is benchmarking against comparable properties (comp set) and tracking trends over time rather than using an absolute figure.

ADR measures revenue per occupied room and ignores empty rooms. RevPAR (Revenue Per Available Room) divides revenue by all available rooms, so a low occupancy rate reduces RevPAR even when ADR is high. RevPAR is the industry standard for comparing overall room-revenue performance.

No. ADR uses room revenue only. Food, beverage, spa, parking, and other ancillary revenue are excluded. Including them overstates ADR and makes cross-property comparisons misleading.

也称为

average daily rate hotel
hotel adr formula
revpar calculator
hotel occupancy rate
room revenue per night
hotel performance metrics
hospitality kpi calculator

APA

TG we-Calculate Editorial Team. (2026). ADR Calculator — Average Daily Rate for Hotels [Online calculator]. TG we-Calculate. https://we-calculate.com/zh/calculator/adr-calculator

Chicago

TG we-Calculate Editorial Team. "ADR Calculator — Average Daily Rate for Hotels." TG we-Calculate. 2026. https://we-calculate.com/zh/calculator/adr-calculator.

IEEE

TG we-Calculate Editorial Team, "ADR Calculator — Average Daily Rate for Hotels," TG we-Calculate, 2026. [Online]. Available: https://we-calculate.com/zh/calculator/adr-calculator

BibTeX

@misc{wecalculate_adr_calculator, title = {ADR Calculator — Average Daily Rate for Hotels}, author = {{TG we-Calculate Editorial Team}}, howpublished = {\url{https://we-calculate.com/zh/calculator/adr-calculator}}, year = {2026}, note = {TG we-Calculate} }

这个计算器对您有帮助吗?